Perencanaan Sistem PLTS Hybrid 5 kWp Di Kantor Desa Grujugan Jawa Tengah
Total View This Week0
Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
Meilasari, Windi Tri
Husada, Hendrianto
Subject
Teknik Elektro 
Datestamp
2022-09-29 07:13:11 
Abstract :
Electrical energy plays a very important role in supporting human life. Savings on electricity bills can be done by applying a solar power plant to the electrical installation of the office building. This study discusses the planning of a hybrid solar power plant on the roof of the Grujugan Village office building. In this study, we will discuss how to design a hybrid system both technically and economically in accordance with the conditions in the Grujugan village office building. The components in this study consist of: solar panels, batteries, inverters and PVsyst as the simulator. The PLTS system with a capacity of 4336.02 watt peak on the roof of the Grujugan Village office is planned to produce 7219.0 kWh of electrical energy per year with a performance ratio of 0.82 with a return on investment of 19 years and 6 months. 
Institution Info

Institut Teknologi Perusahaan Listrik Negara