DETAIL DOCUMENT
RANCANG BANGUN PEMASANGAN PLTS HYBRID 2 KWP UNTUK MENGURANGI TAGIHAN REKENING LISTRIK PLN PADA RUMAH KOST 17 KAMAR DI YOGYAKARTA
Total View This Week0
Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
RANI, MUTIARA
Januwarsono, Santoso
Sukmajati, Sigit
Subject
Teknik Elektro 
Datestamp
2022-09-29 03:27:10 
Abstract :
To reduce electricity bills from PLN, especially for boarding houses in Yogyakarta, it can be done by implementing the installation of a Rooftop Solar Power Plant (PLTS) on the building in question which is connected in parallel with the PLN electricity network in Ongrid and On/Off-grid (hybrid). The Yogyakarta area is geographically located below the Equtor line, so that the most optimal installation of the PV module faces north with a slope angle of 5 degrees and has an irradiation of 4.8 kWh/m2. So it has the potential to develop the use of solar energy to be developed as an alternative energy . This study discusses the Planning of a Hybrid Solar Power Plant with a capacity of 2 kWp. The Yogyakarta area is a tropical area where the weather is more sunny than cloudy, so the most optimal in energy production is the monochristalline type PV module. Because the PV module that has been provided by the boarding house owner is a polychristalline type with a capacity of 250 Wp per module, this type of PV module will be installed. With a capacity of 2 kWp, the number of PV modules to be installed is 8 pcs. The installation of this 2 kWp PLTS Hybrid is estimated to require an investment budget of Rp. 69,111,000 assuming per WP = $2.38 and potential monthly electricity cost savings of IDR 233.625 per month or 30% per month 
Institution Info

Institut Teknologi Perusahaan Listrik Negara